Kayak Building Class - Day 2
The 2nd day of actual kayak building
Day 2 - Steam box - The kayak with the seam bok (for the ribs) in the background.
 Day 2 - Steam box 

Day 2 Steaming Ribs - Steaming the ribs before bending them and inserting them in the kayak.
 Day 2 Steaming Ribs 

Day 2 - Bending and inserting the ribs - Here is a shot at Brian demonstrating the insertion of the steaming ribs.
 Day 2 - Bending and inserting the ribs 

Day 2 - End of the day - The status of the kayaks at the end of the Day 2.  Ribs and keel in place.
 Day 2 - End of the day 

Day 2 - End of day  - This is a shot of the kayaks at the end of the day with ribs and keel in place.
 Day 2 - End of day  

(Click for Larger Image)      Images 1 to 5 of 5